At 7:30 PM -0700 4/26/97, Steve Weisbrod wrote:
>I put in the guy anchors today. Iam waiting for the cement to cure.
>Anyone have an idea as to how long before the base is ready to take a
>tower?
A minimum of 28 days, Steve. You might want to check with a local concrete
contractor who is familiar with your area, the size of your base and the
composition of your pour, but 28 days is a rule of thumb I have lived by
for a long time.
73, Dick
--
Dick Flanagan W6OLD CFII Minden, Nevada
Visit http://wadg.greatbasin.net/siera/
--
FAQ on WWW: http://www.contesting.com/towertalkfaq.html
Submissions: towertalk@contesting.com
Administrative requests: towertalk-REQUEST@contesting.com
Problems: owner-towertalk@contesting.com
|