Ken: When I put up Rohn 25 at my first QTH I bolted 2 sections together, made sure they were plumb, and tied them off in several directions before pouring the concrete. As the concrete as being poured I constantly rechecked the bottom section with a level to make sure it stayed plumb and tightened/loosened any of the support ropes to make sure it stayed plumb. Did same as the concrete was drying although little/no movement was detected after the concrete was poured. I buried about 4-5 feet of the 1st section. Also I put a several inch layer of river rock/gravel in the bottom of the hole and set the legs of the bottom section into it about a foot inches or so to allow for drainage, even though freezing is not that much of a worry in Texas. Lets any condensation that forms inside the legs to drain out. Tom, WW5L kenneth.lowrey@wright.edu wrote: I am finally getting a tower after hamming for 41 years!! _______________________________________________ See: http://www.mscomputer.com for "Self Supporting Towers", "Wireless Weather Stations", and lot's more. Call Toll Free, 1-800-333-9041 with any questions and ask for Sherman, W2FLA. _______________________________________________ TowerTalk mailing list TowerTalk@contesting.com http://lists.contesting.com/mailman/listinfo/towertalk |
<Prev in Thread] | Current Thread | [Next in Thread> |
---|---|---|
|
Previous by Date: | Re: [TowerTalk] RE: Erecting tower, WD0M |
---|---|
Next by Date: | Re: [TowerTalk] RE: Erecting tower, gdaught6 |
Previous by Thread: | Re: [TowerTalk] RE: Erecting tower, Alan C. Zack |
Next by Thread: | Re: [TowerTalk] RE: Erecting tower, K7LXC |
Indexes: | [Date] [Thread] [Top] [All Lists] |