Try http://www.rotor-doc.com Look at the qc conn. As and this just might do the trick by machining the housing. 73 Gene K2QWD Hi Again I've been asking lots of questions and have been getting lots of
Here in NJ the local concrete plant will take and recycle it. Just a thought for you. 73 Gene K2QWD Then what do I do with it? Pay the tow truck driver to deposit it in a local dumpster? Can you imag
Anyone have the wind loading between both owls. I hate to use the wrong one. 73 Gene K2QWD _______________________________________________ _______________________________________________ TowerTalk ma
This is where digital camera's shine so to speak and you in some cases shoot a detailed movie of all the part's and location. Just be sure to block and chain all the sections so they cannot move and
Check for voltage drop and start at the mains of the house and make sure all the connections are tight. What you are describing are all the symptoms' of a voltage drop in a single phase system and be
Depending on the type you are using be real careful about the ground you set on and level is very importance to all of them. In some cases setup on 3/4 plywood is called for. The company that rent it
This must make me one of those weird ducks.. I have an SSMW 80 foot tower in Rohn engineering, as we speak. ON the list, is a cable tower arrest system and I personally plan never ever to climb this
As long as the exciting pad is of the correct size and concrete is in good condition I would use concrete epoxy and bolts for the job. Hilti make wide range of different systems to do this with. http
Les. I looked at the schematic and DO NOT WIRE OR HOOKUP TO 220 Volts. All the control relays ect are wired in a 110 Volt setup. It's a old relay logic circuit and would require a lot of parts and re
In my trade it's called 3M ELECTRICAL 500-15603 "SCOTCH" 70 SELF-FUSING SILICONE RUBBER ELECTRONICAL TAPE,1"x30Ft. We use it on HV 5KV or more on underground spices and motor connections Great stuff.
Are you ready for this Tri-Ex Catalog dated 5-69 Self Supporting Tower HZN available models 4 Max Dead Load Capacity 275 LB. Maximum Antenna wind Load 12 sq ft 2 feet above top of tower at 60 mph and
I'm no expert in unfreezing one but change a live one for a friend that the same thing had happened two and replaced with a new Thern unit. 1: Safety first always. Install a two by four between the t
I want to keep this in a proper prospective as the ground you are digging in can be a lot of different types and without knowing for sure it can range from cement hard to soft sand. My 555 pad is 6x6
Couple of thoughts. First call the concrete plants and find the per yard delivered price around here no truck charge after 5 yards. Can you back the truck to the hole or do you have to pump it? The r
To speed up the whole learning process for you just do a Google search on rebar grounding and you will be good to go. Their is so much well written material on this subject and one of the few changes
After over 30 years in the Electrical trade I'm still hold Mother Nature in a great deal of respect and awe in the speed and the Hugh amount of damage a lightning strike can do, My wife called me and
Big project is now underway and we are working on the reduction of the top section down to 26 inch Pirod. Design is from Hank Lonberg P.E. / KR7X and if anyone needs design work done at the PE level
First of all, I would rather just represent what I know about the subject as I have accomplished it on at least 2 occasions. In most communities, code enforcement are the officials that you have to f
Greg, No problem except make sure the Epoxy in NOT EXPIRED. Hilti is a good source and also can supply bolts though an industrial suppler. www.us.hilti.com/holus/modules/adansel/adas_main.jsp About b
I would like you to consider this as cost effective: let's say it cost you $300 to dig the hole. The cost of a funeral is somewhere between $6,000 and $30,000! The emotional trauma to the family I do