Search String: Display: Description: Sort:

Results:

References: [ +subject:/^(?:^\s*(re|sv|fwd|fw)[\[\]\d]*[:>-]+\s*)*\[TowerTalk\]\s+KLM\s+40M4\s+Linear\s+Loading\s+Hardware\s*$/: 3 ]

Total 3 documents matching your query.

1. [TowerTalk] KLM 40M4 Linear Loading Hardware (score: 1)
Author: DENNIS BRICKEY <n4dd@embarqmail.com>
Date: Fri, 11 Jan 2008 20:38:56 -0500 (EST)
Hey Guys, I'm rebuilding a couple of KLM 40M4 yagis. The plastic peanuts that are inserted into the boltmounting ends of the loading tubes have deteriorated to some degree and some of them have broke
/archives//html/Towertalk/2008-01/msg00194.html (6,867 bytes)

2. Re: [TowerTalk] KLM 40M4 Linear Loading Hardware (score: 1)
Author: Doug Renwick <ve5ra@sasktel.net>
Date: Fri, 11 Jan 2008 21:17:18 -0600
Dennis, I wouldn't worry about milling the Al rod ... just find a rod that is a close fit ... been there, done it. Doug Hey Guys, I'm rebuilding a couple of KLM 40M4 yagis.? The plastic peanuts that
/archives//html/Towertalk/2008-01/msg00200.html (7,507 bytes)

3. Re: [TowerTalk] KLM 40M4 Linear Loading Hardware (score: 1)
Author: Cqtestk4xs@aol.com
Date: Fri, 11 Jan 2008 23:16:57 EST
Having used two 4el 40 KLMs and several KT34XAs at my old QTH, I feel your pain. The newer M2 stuff has an entirely different set up that doesn't use the peanuts. I think that using fiberglass rod or
/archives//html/Towertalk/2008-01/msg00201.html (7,276 bytes)


This search system is powered by Namazu