Search String: Display: Description: Sort:

Results:

References: [ +subject:/^(?:^\s*(re|sv|fwd|fw)[\[\]\d]*[:>-]+\s*)*\[TowerTalk\]\s+P\s+E\s+Fees\s*$/: 4 ]

Total 4 documents matching your query.

1. [TowerTalk] P E Fees (score: 1)
Author: n3huv@shore.intercom.net (Glenn)
Date: Sat, 07 Feb 1998 02:58:53 +0000
Something that no one seems to have noticed. When I buy a tower some part of the cost is for the R & D. Then I hire a P E to stamp the manufacture's drawings. Then I submit the drawings to the county
/archives//html/Towertalk/1998-02/msg00223.html (7,383 bytes)

2. [TowerTalk] P E Fees (score: 1)
Author: k4sb@mindspring.com (K4SB)
Date: Fri, 06 Feb 1998 11:57:34 -0800
Sure, like the house inspector for the home I built who didn't know what a ground fault interrupter was. Or this house which I just bought which doesn't have a master circuit breaker in the CB box. 7
/archives//html/Towertalk/1998-02/msg00228.html (7,349 bytes)

3. [TowerTalk] P E Fees (score: 1)
Author: johnfarr@ro.com (John D. Farr)
Date: Fri, 6 Feb 1998 23:53:07 -0600
No, you haven't paid for the same engineering several times. The tower company has engineered the tower, but only the tower. The tower company has no way whatever to predict the environment that the
/archives//html/Towertalk/1998-02/msg00229.html (8,021 bytes)

4. [TowerTalk] P E Fees (score: 1)
Author: TOMK5RC@aol.com (TOMK5RC@aol.com)
Date: Sat, 7 Feb 1998 11:11:24 EST
<< Sure, like the house inspector for the home I built who didn't know what a ground fault interrupter was. Or this house which I just bought which doesn't have a master circuit breaker in the CB box
/archives//html/Towertalk/1998-02/msg00234.html (9,158 bytes)


This search system is powered by Namazu