Search String: Display: Description: Sort:

Results:

References: [ +subject:/^(?:^\s*(re|sv|fwd|fw)[\[\]\d]*[:>-]+\s*)*\[TowerTalk\]\s+Tilting\s+a\s+DX\-70\s*$/: 3 ]

Total 3 documents matching your query.

1. Re: [TowerTalk] Tilting a DX-70 (score: 1)
Author: al.n6ta@gmail.com
Date: Sat, 26 Jun 2021 20:24:37 -0700
The current Tashjian tilt over design pivots the vertical tower about 8.5' above the base of the tower. It is balances at the CG of the tower so not in the middle of the collapsed tower. So when it i
/archives//html/Towertalk/2021-06/msg00109.html (7,981 bytes)

2. Re: [TowerTalk] Tilting a DX-70 (score: 1)
Author: Ken Alker <ka6ken@alker.net>
Date: Sun, 27 Jun 2021 07:42:05 -0700
Maybe a visual will help clarify. Is the Tilt-Over Accessory the one shown on page 21 of this document?: <https://www.tashtowers.com/docs/2021_Tashjian_Towers_Catalog.pdf> If so, it appears the tower
/archives//html/Towertalk/2021-06/msg00113.html (9,628 bytes)

3. [TowerTalk] Tilting a DX-70 (score: 1)
Author: al.n6ta@gmail.com
Date: Thu, 8 Jul 2021 21:44:43 -0700
To close out this topic, I add the following: Tashjian does not want anything in the tower, even a mast, while the tower is being raised with their TA-86L raising fixture. The tower is very heavy and
/archives//html/Towertalk/2021-07/msg00012.html (7,575 bytes)


This search system is powered by Namazu