Here in Atlanta I've a 2500V 1.7 A CCS
We're talking 5 kW brick on the key here.
Apply the typical inflation numbers for
lower duty cycle applications.
Primary is single phase dual 115V 50/60 Hz.
I was planning to build a 5 kW AM SW
TX using some phase modulated GS35B.
However, too many projects and loss of
shop space requires that both the number of
and physically more massive projects
See it here:
http://www.edebris.com/catalog/view_item.php?id=51
wwd@netheaven.com wrote:
>>Anyone interested in about 100 pounds of new Mil-Spec 120/240V primary,
>>2800V (rectified & filtered) at .85A continuous duty? Also
>>
>
> Just 2800 volts? Frankly, it would be a whole lot more interesting if it
> were bridgeable to around 5kv.
>
> Is it a 1400-0-1400 xfmr or ?? The tap implies a ct, but can the ct float?
>
> I need 5kv. 8-)
>
> Bill K2AME
|