Any advice and or experiences with the following scenario?
I am going to install a self supporting aluminum tower. The base will be
4'x4' wide and 6' deep. I am located near the shore in CT and the water
table is high, especially with the recent rains. I began to dig the hole for
the base and struck water at about the 2 1/2' level. The water table usually
drops later in the summer. Any ideas on how to complete digging the hole and
pour the base or do I wait for a drought?
73,
Joe
--
FAQ on WWW: http://www.contesting.com/towertalkfaq.html
Submissions: towertalk@contesting.com
Administrative requests: towertalk-REQUEST@contesting.com
Problems: owner-towertalk@contesting.com
Search: http://www.contesting.com/km9p/search.htm
|