Towertalk
[Top] [All Lists]

[TowerTalk] Hurricane temporary tower guying

To: <towertalk@contesting.com>
Subject: [TowerTalk] Hurricane temporary tower guying
From: stan@capeonramp.com (stan)
Date: Thu, 27 Aug 1998 23:21:09 -0400
would it serve any purpose to add additional temporary guys
at a level midway between existing permanent guys ,
during wind storm conditions ?

How about closer to the bottom or between the ground
level and the first permanent level

I have 70' of ROHN 45 guyed at the top, 70' and at the 29' level.
I was thinking of temporary guys at the 50' level,  and at 15'.....


Stan, WA1ECF   Cape Cod, MA   FN41sr






--
FAQ on WWW:               http://www.contesting.com/towertalkfaq.html
Submissions:              towertalk@contesting.com
Administrative requests:  towertalk-REQUEST@contesting.com
Problems:                 owner-towertalk@contesting.com
Search:                   http://www.contesting.com/km9p/search.htm


<Prev in Thread] Current Thread [Next in Thread>