>would it serve any purpose to add additional temporary guys
>at a level midway between existing permanent guys ,
>during wind storm conditions ?
>
>How about closer to the bottom or between the ground
>level and the first permanent level
>
>I have 70' of ROHN 45 guyed at the top, 70' and at the 29' level.
>I was thinking of temporary guys at the 50' level, and at 15'.....
>
>
>Stan, WA1ECF Cape Cod, MA FN41sr
I would add them and leave them there permanently.