Towertalk
[Top] [All Lists]

[TowerTalk] Removing concrete

To: <towertalk@contesting.com>
Subject: [TowerTalk] Removing concrete
From: k4ja@contesting.com (Paul Hellenberg K4JA)
Date: Thu, 1 Jul 1999 08:40:32 -0500
Hello All

As part of my on going preparations to move east I took down 4 170' tower
with a crane.  It all went well in and took about 5 hours.

I also made a deal with a landscaping contractor to be on site with a
backhoe. He dug on several sides of the base and we pulled all the bases and
guy posts, loaded them on a flat bed and hauled them away. By 5 PM all the
holes were filled and rough graded.

I have guy posts on all the tower bases as well a the guy points. They all
have welded plates for turn buckles.  That really helped.

Paul Hellenberg
K4JA ex W9JA KS9K
http://www.contesting.com/tours/W9JA/index.html

Callao, VA. in 2000


--
FAQ on WWW:               http://www.contesting.com/towertalkfaq.html
Submissions:              towertalk@contesting.com
Administrative requests:  towertalk-REQUEST@contesting.com
Problems:                 owner-towertalk@contesting.com
Search:                   http://www.contesting.com/km9p/search.htm


<Prev in Thread] Current Thread [Next in Thread>
  • [TowerTalk] Removing concrete, Paul Hellenberg K4JA <=