I'm no engineer of any sort, but I've seen many concrete buildings framed
with steel girders, some of which were driven into the earth. I would think
such a building's entire electrical and electro-mechanical compatibility
systems would be bonded to that frame. So I conclude that the tower should
connect into that system, too.
Just an opinion/idea to toss for reflection.
73, Bert N4CW
--
FAQ on WWW: http://www.contesting.com/towertalkfaq.html
Submissions: towertalk@contesting.com
Administrative requests: towertalk-REQUEST@contesting.com
Problems: owner-towertalk@contesting.com
Search: http://www.contesting.com/km9p/search.htm
|