| To: | <towertalk@contesting.com> |
|---|---|
| Subject: | [TowerTalk] Concrete from on-site materials |
| From: | aa4lr@arrl.net (Bill Coleman) |
| Date: | Tue, 5 Mar 2002 14:32:45 -0500 |
On 3/5/02 12:43 AM, Hisashi T Fujinaka at htodd@twofifty.com wrote:
>I'd suggest premix and a pump.
For the amount of concrete (.7 Yards) and all the minimum fees, it worked
out to be a LOT cheaper to mix it myself.
If I were pouring a base and three guy points, Ready-Mix might have been
a better option.
Bill Coleman, AA4LR, PP-ASEL Mail: aa4lr@arrl.net
Quote: "Not within a thousand years will man ever fly!"
-- Wilbur Wright, 1901
|
| <Prev in Thread] | Current Thread | [Next in Thread> |
|---|---|---|
| ||
| Previous by Date: | [Towertalk] RFI Workshop, David L. Thompson |
|---|---|
| Next by Date: | [Towertalk] Yaesu indicator, Pete Smith |
| Previous by Thread: | [TowerTalk] Concrete from on-site materials, Hisashi T Fujinaka |
| Next by Thread: | [TowerTalk] Concrete from on-site materials, Bob Nielsen |
| Indexes: | [Date] [Thread] [Top] [All Lists] |