To: | <towertalk@contesting.com> |
---|---|
Subject: | [TowerTalk] Concrete from on-site materials |
From: | aa4lr@arrl.net (Bill Coleman) |
Date: | Tue, 5 Mar 2002 14:32:45 -0500 |
On 3/5/02 12:43 AM, Hisashi T Fujinaka at htodd@twofifty.com wrote: >I'd suggest premix and a pump. For the amount of concrete (.7 Yards) and all the minimum fees, it worked out to be a LOT cheaper to mix it myself. If I were pouring a base and three guy points, Ready-Mix might have been a better option. Bill Coleman, AA4LR, PP-ASEL Mail: aa4lr@arrl.net Quote: "Not within a thousand years will man ever fly!" -- Wilbur Wright, 1901 |
<Prev in Thread] | Current Thread | [Next in Thread> |
---|---|---|
|
Previous by Date: | [Towertalk] RFI Workshop, David L. Thompson |
---|---|
Next by Date: | [Towertalk] Yaesu indicator, Pete Smith |
Previous by Thread: | [TowerTalk] Concrete from on-site materials, Hisashi T Fujinaka |
Next by Thread: | [TowerTalk] Concrete from on-site materials, Bob Nielsen |
Indexes: | [Date] [Thread] [Top] [All Lists] |