At 11:09 AM 4/4/02 -0800, Chris BONDE wrote:
>With the SARCASM do I detect something like, "This might be an idea that
>will catch aon and it will ruin my business?" Note sarcasm. It was just
>an idea that I have talked over with some others. If the lamp standards,
>traffic control lights etc can use pre-cast blocks, and if, easier
>and heaper why cannot ham towers. Maybe you are correct in the engineer
>but why not have the engineer sign off on the cast in the hole, whcih cold
>be less controllable.
Some questions: Do you have the tower in question? Are you a professional
engineer? Are you suggesting that a PE sign off on something which the
manufacturer strongly recommends and which might be required by building codes?
And finally, this is a sarcastic question, why do you impute self interest
in the advice a knowledgeable professional installer gave without
compensation?
Tacky
|