Hi Paul,

A couple of thoughts:

Two people can "walk up" 30 ft of R25. My wife and I
did it when I installed my tower. Since you have a
convenant "pull point", it may be easier just pull it
up with a rope.

My 60ft R25 is guyed at 30 and 58 FT. My top guys are
at 58 ft, 2 ft below the top. Having these guys 2-5
feet down from the top makes sense. They are then out
of the way when installing wire antennas or when
working on the rotary antennas. I probably would NOT
do this if I were installing a really big antenna!

If you have the first 30 ft up, with the guys
attached, you can plumb the tower for true vertical
before adding the top 40ft.

I'd probably do the final installation in two lifts.
First, install the top 40ft with the rotator and mast
and top guys installed. Attached the guys at ground
level then plumb the top 40 ft. After all is plumb and
secure, lift and install the yagi. 

GL with the project!

73, Stew K3ND



__________________________________
Do you Yahoo!?
Yahoo! Mail - More reliable, more storage, less spam
http://mail.yahoo.com
_______________________________________________

See: http://www.mscomputer.com  for "Self Supporting Towers", "Wireless Weather 
Stations", and lot's more.  Call Toll Free, 1-800-333-9041 with any questions 
and ask for Sherman, W2FLA.

_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

<Prev in Thread] Current Thread [Next in Thread>