I suspended mine from 2 X 4's laid across the hole, using the same kind of
wire I used to tie the pieces of rebar together. After the concrete was
poured, I shoved diagonal cutters down into the poured concrete and clipped
off the wires beneath the surface, and then made sure I smoothed over the
hole where I removed the cutters.
Then I immediately washed the concrete off the cutters.