I sure am glad I single-bid my tower hole, cage, base and pour. The
original spec's on the tower base were 5.5' X 5.5 ' X 7.0'. The
contractor was one of these types who figured there wasn't any problem
his big-a**ed back-hoe couldn't solve. Unfortunately for him, one of
its primary shortcomings was the inability to dig an accurate sized hole.
The final dimensions were 9.0' X 9.0' X 10.0' and it took two Redicrete
trucks to bring in the requisite 16+ yards of concrete. The contractor
said he would have saved a lot of money if he had just hired two guys to
hand-dig the hole and left his back-hoe at home.
Dick
Dick Flanagan K7VC
dick@k7vc.com
On 5/3/2011 6:55 AM, Brahmangou@aol.com wrote:
> 4/10 cubic foot per 60 pound bag.
> Marty AB5GU
> _______________________________________________
>
>
>
> _______________________________________________
> TowerTalk mailing list
> TowerTalk@contesting.com
> http://lists.contesting.com/mailman/listinfo/towertalk
>
>
>
>
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
|