On 6/18/13 8:15 AM, GEO Badger wrote:
Battery, battery box, solar panel and controller out in the area where your
tower(s) are will eliminate that pair of conductors.
I've tried this, and it works fairly well, but I found that running
power out is often easier in the long run. In fact, what I did is run
unregulated DC out, and had a point of load DC/DC converter to trickle
charge the battery. A lot of these switching/control functions are high
peak, low average power.
If you're digging a trench, dropping in another 3/4" conduit to carry
AC power means you can have a convenience outlet to plug in things like
soldering irons, test equipment, a sawzall, etc.