Towertalk
[Top] [All Lists]

[TowerTalk] Schedule 40 PVC

To: <towertalk@contesting.com>
Subject: [TowerTalk] Schedule 40 PVC
From: k4sb@worldnet.att.net (Ed Sleight)
Date: Mon, 15 Sep 1997 02:06:58 -0700
Two things...

1. If you put all the cables through the individual pipe sections BEFORE
you glue them together, you eliminate a lot of trouble.

2. Whenever you add a cable, just tape another length of pull rope to
the cable, pull on the one already in place, and when you're through,
you have a new pull rope in place.

73

Ed

--
FAQ on WWW:               http://www.contesting.com/towertalkfaq.html
Submissions:              towertalk@contesting.com
Administrative requests:  towertalk-REQUEST@contesting.com
Problems:                 owner-towertalk@contesting.com
Search:                   http://www.contesting.com/km9p/search

<Prev in Thread] Current Thread [Next in Thread>