>     It should be in one pour so that the base is totally 
> bonded together. If 
> the bottom pour has 'gone off' and hardened, you wind up 
> with two separate 
> layers. 
> 
>     Sometimes there are two pours if you have to have two 
> trucks worth of 
> concrete but they are poured consecutively with little or 
> no time delay. 

So how much delay is tolerable?  It takes me 20-45 minutes
to drive back to the ready mix place 1 1/2 miles away,
get reloaded, and drive back.  After 45 minutes, I can
at least poke a hole in the previously poured cement
with a stick.  Is this good enough?  Is it helpful to
sprinkle a little water on the top to slow down the
curing before the next pour?  Always wondered about this
stuff.  It is sn't covered in any concrete books I've read :-)