[Amps] Where is power measured ?

Paul Christensen w9ac at arrl.net
Wed Apr 6 05:52:11 PDT 2011


97.3(b)(6) and 97.313(b) require that maximum allowable power occur at the 
transmitter output (aka, "TPO").   I prefer it that way rather than the FCC 
start regulating power based on ERP or EIRP.

Paul, W9AC 



More information about the Amps mailing list