[Mldxcc] VK0EK Starting teardown
Richard (Rick) Karlquist
richard at karlquist.com
Sat Apr 9 10:35:56 EDT 2016
DX world is saying that this morning was their last 160 meter
operation. Again, nothing at all was heard here.
Rick N6RK
On 4/9/2016 7:05 AM, Rick WA6NHC wrote:
> So much for the extra day. Teardown was supposed to start after our
> Monday morning...
>
> But I applaud the ATNO concept, please pay extra attention to the op.
>
> Rick
>
>
>
> -=-=-=-=-=-=-
>
> 2016-04-09 09:11:40Z: Bad weather has begun to set in, and is likely to
> be here for a while. With our departure coming soon, this means that
> teardown is beginning. We will try to stay on the air as long as
> possible, but may have a reduced number of stations on the air, and a
> reduced complement of antennas to use. Watch DXA to see where our
> stations are operating.
> We will post updates as they become available, but everyone is busy
> here, either working the pileups or packing things up. Please listen to
> operator instructions---if they are calling for all-time new ones and
> you have us in the log, please stand by.
> At 0900z, the sky was overcast with a light wintry mix of precipitation
> falling (snow/graupel/drizzle). The temperature was 2 C, sustained winds
> at or in excess of 30 kts, and a pressure of 968 mbar.
> _______________________________________________
> Mldxcc mailing list
> Mldxcc at contesting.com
> http://lists.contesting.com/mailman/listinfo/mldxcc
> Need list help? Contact mldxcc-owner at contesting.com
>
>
More information about the Mldxcc
mailing list