[RFI] Solar Panel Manufacture Schedules Fix For Solar Panel RFI
nm8rmedic
nm8rmedic at rocketmail.com
Thu May 17 13:57:33 EDT 2018
I believe the issue is conductor heating. Sheathed cable has to be in open-air to maintain its rating. Conduit that encloses it impacts air flow.
Someone advise if my understanding is incorrect. I do not fully understand the electrical code. I am not licensed to expound on the electrical code. The only person I've ever encountered that would be even close, would be Mike Holt...
Scott NM8R
Sent via the Samsung Galaxy S8+, an AT&T 4G LTE smartphone
-------- Original message --------From: Jim Brown <jim at audiosystemsgroup.com> Date: 5/17/18 12:55 PM (GMT-05:00) To: rfi at contesting.com Subject: Re: [RFI] Solar Panel Manufacture Schedules Fix For Solar Panel RFI
On 5/17/2018 9:20 AM, Alan NV8A wrote:
> Correct me if I am misremembering, but isn't running Romex in conduit
> a Code violation?
I don't know. I've never thought about doing that. It would be much
harder to pull than individual conductors and it would be a waste of
conduit fill capacity.
> Running twisted separate conductors in conduit would not be.
Right. And if it's steel conduit, twisting is not important.
73, Jim K9YC
_______________________________________________
RFI mailing list
RFI at contesting.com
http://lists.contesting.com/mailman/listinfo/rfi
More information about the RFI
mailing list