[TowerTalk] Slump testing?
   
    w2xx@cloud9.net
     
    w2xx@cloud9.net
       
    Tue, 7 Apr 1998 14:06:52 -0400 (EDT)
    
    
  
On Tue, 7 Apr 1998, K7LXC wrote:
>       Since Rohn specs call for 3000 psi in 28 days, why the hangup on whether
> you've got 4000 or 5000 concrete? You're only talking about a yard or less of
> concrete anyway.
True, but I am pouring a base for 120 feet of AB-105 and three guy
anchor points...more like 7.5 yards total.
The plans filed with the building dept. call for 4000 PSI. The 5000
rating is just insurance.  I figured if it takes longer than I had
hoped to pump the concrete 300 feet into 4 different holes, I won't
be compromising strength if I have to add a little water to add
workability time.  All I need is to clog up a $100,000 concrete
pump...
>      Besides if you can't depend on your concrete supplier, who can you count
> on?
True...those cement shoes last forever!
73, J.P.
================================================================
J.P. Kleinhaus, W2XX  (fdba AA2DU)
E-mail:  w2xx@cloud9.net
As we say in the software business:  "You are hosed."  
================================================================
--
FAQ on WWW:               http://www.contesting.com/towertalkfaq.html
Submissions:              towertalk@contesting.com
Administrative requests:  towertalk-REQUEST@contesting.com
Problems:                 owner-towertalk@contesting.com
Search:                   http://www.contesting.com/km9p/search