[TowerTalk] Slump testing?

K7LXC K7LXC@aol.com
Tue, 7 Apr 1998 13:39:11 EDT


In a message dated 98-04-07 13:21:29 EDT, w2xx@cloud9.net writes:

> I am scheduled to pour concrete for my (long awaited) tower
>  project on Friday.  I ordered 5000 PSI mix, but realize that
>  short of performing a slump test on site, I have no way of knowing
>  if the stuff being delivered will be up to spec.
>  
>  Any hints on doing this?  Has anyone actually done this before,
>  or should I assume that since I ordered 500 PSI, I should end
>  up with at least 4000 PSI ? :-)

      Since Rohn specs call for 3000 psi in 28 days, why the hangup on whether
you've got 4000 or 5000 concrete? You're only talking about a yard or less of
concrete anyway.

     Besides if you can't depend on your concrete supplier, who can you count
on?

Cheers,  Steve  K7LXC

--
FAQ on WWW:               http://www.contesting.com/towertalkfaq.html
Submissions:              towertalk@contesting.com
Administrative requests:  towertalk-REQUEST@contesting.com
Problems:                 owner-towertalk@contesting.com
Search:                   http://www.contesting.com/km9p/search