[TowerTalk] Rohn 45 takedown
David J. Windisch
davidw@copper.net
Mon, 11 Dec 2000 13:13:47 -0500
Hi, all concerned:
A fellow asked me to take down a 58' stack and a 48' stack, both 8 years
old, and both bracketed twice to the side of his 2-1/2 story brick house.
He wants me to 'pay' myself from the proceeds of selling the pieces, which
I'm willing to do, and turn over the excess. I want to do what is
equitable.
There is no rust that I could see. It looks as if the base plates are
'buried' in the concrete base, and will be left.
1. What are the sections worth 'on the ground'?
2. What is the worth of the 8-year-old KLM34?
3. Is it worth it to buy that 'Tower Jack' I see advertised, for 'easy'
separation just for this job?
4. What's a fair charge for doing this job in turn-key-style?
TIA; 73, Dave, K3BHJ
--
FAQ on WWW: http://www.contesting.com/FAQ/towertalk
Submissions: towertalk@contesting.com
Administrative requests: towertalk-REQUEST@contesting.com
Problems: owner-towertalk@contesting.com