[TowerTalk] A new (?) tower design

Alan C. Zack k7acz at cox.net
Sun Jan 25 17:43:48 EST 2004


I agree he is on the main section attaching the pulley in order to
pull up the next section.  You would not be putting the pulley on the
offset section, would you?
I would like to know if they tilt over for those who want to place the
tower next to a 2 story house.

"Joe Subich, K4IK" wrote:
> 
> Gary,
> 
> > Take a look here:  http://www.onemantowers.com/photopage1.html
> >
> > About 1/3-1/2 half way down the page on the left, right above
> > the caption :
> >
> > "Attaching the cable pulley to the top of the section. This
> > step is repeated for each section as it is placed".
> 
> That's climbing the main section ... the new/offset section is
> the shorter piece visible just to the left.  At this point it
> looks like the tower has two sections in the main and one on
> the lift.
> 
> 73,
> 
>    ... Joe, K4IK
> 
> 
> _______________________________________________
> 
> See: http://www.mscomputer.com  for "Self Supporting Towers", "Wireless Weather Stations", and lot's more.  Call Toll Free, 1-800-333-9041 with any questions and ask for Sherman, W2FLA.
> 
> _______________________________________________
> TowerTalk mailing list
> TowerTalk at contesting.com
> http://lists.contesting.com/mailman/listinfo/towertalk

-- 
__________________________________________________________________________                       
                                     Alan Zack
                     Amateur Radio Station K7ACZ
                         Las Vegas, Nevada, USA
          Quality Engineer, The Boeing Company, Retired
  Aviation Chief Warrant Officer, U.S. Coast Guard, Retired
        U.S. Coast Guard, Always Ready, Always There
Every hour, Every day, Around the Clock and Around the World
                               SEMPER PARATUS


More information about the TowerTalk mailing list