[TowerTalk] ground systems... ferrous conduit
Jim Jarvis
jimjarvis at comcast.net
Wed Feb 2 17:31:24 EST 2005
Jim, W6RMK provided a link to the FAA's lightning ground and
surge protection standards. They include a requirement that
cables pass through a grounded 10' long ferrous conduit (pipe),
before entering a structure.
I recall reading that this serves as a choke for current
flowing on those cables. As a result, I've routed all my
runs through a section of iron pipe, for as long as I can
remember.
On the other hand...I ALSO recall reading comments on here
poo poohing the idea.
Comments from someone who really knows?
N2EA
jimjarvis at ieee.org
More information about the TowerTalk
mailing list