[TowerTalk] How best to keep the rebar cage centered in the hole?
Karen Ashpole
ruthere_bear02 at hotmail.com
Thu Oct 12 08:50:11 EDT 2006
scotty, nail a 2x4 across the top of the form and tie wire your cage to it. start your concrete pour in center of the rebar cage, slowly fill the form from the center first. the concrete in the center will stabilize the cage. Jam an 8 ft 2x4 at an angle thru the cage using it as a lever to hold the cage and move it as needed.Don,t worry about rusted rebar concrete is pourous ask anyone with a leaky basement! To judge how long your rebar will last just leave a piece beside your tower pad.
Dave NB7V
General contractor when not contesting