[TowerTalk] Yet another Hazer Guying Question

ww3s at zoominternet.net ww3s at zoominternet.net
Tue Apr 6 10:24:47 PDT 2010


 

	temporary guy below where you normally do, drop your top guys, lower
the hazer, reattach your upper guys, then drop your temp ones and
crank down...it's a pain, but better safe than sorry... 
 On Tue 04/ 6/10 8:21 AM , K7LXC at aol.com sent:
 In a message dated 3/30/2010 8:22:57 P.M. Pacific Daylight Time, 
 towertalk-request at contesting.com [1] writes:
 > I have been thinking about putting up a Rohn25 with a homemade
steel
 welded Hazer. From what I have read, if you do not want to do any
 climbing with the Hazer above you, the tower will be temporarily
self 
 supporting because you
 need to drop a couple of guys until the assembly is lowered below
it. True?
 Unfortunately yes. IMO it's a terrible technique although many
people 
 do it. 
 Cheers,
 Steve K7LXC
 TOWER TECH -
 Professional tower services for hams
 _______________________________________________
 _______________________________________________
 TowerTalk mailing list
 TowerTalk at contesting.com [2]
 http://lists.contesting.com/mailman/listinfo/towertalk [3]


Links:
------
[1] mailto:towertalk-request at contesting.com
[2] mailto:TowerTalk at contesting.com
[3] http://lists.contesting.com/mailman/listinfo/towertalk


More information about the TowerTalk mailing list