[TowerTalk] tower installation HG52SS / options

K1TTT K1TTT at ARRL.NET
Sun Feb 14 12:18:06 PST 2010


> I guess one could argue the other side of the coin.
> 
> "You guys are over-engineering all of this. Just drill three 1" holes in
> the rock and epoxy the rebar or anchor bolts in. No concrete needed"
> :)
> 
> I guess anything more than that is based on ???
> 
> Once you start pouring any concrete, you have to ask why?  That's the
> engineering. It makes a lot of sense to not over-engineer.
> The question is "what is over, and what is under?"

in a situation like that only a real engineer knows for sure.  Consult one
and sleep well on windy nights.


David Robbins K1TTT
e-mail: mailto:k1ttt at arrl.net
web: http://www.k1ttt.net
AR-Cluster node: 145.69MHz or telnet://dxc.k1ttt.net
 





More information about the TowerTalk mailing list