[TowerTalk] Tower Problems
Joseph or Ruth Patrick
hdmc38 at bellsouth.net
Fri Jan 7 12:04:09 PST 2011
Hey Mike
You need to look for someone that has a Bobcat with a jack hammer on it. We use
them all the time for demolition.
If the soil is like you say around your area you should be able to find someone
that has what you need. I live in a residential area so I needed a permit for my
tower.I hired a contractor who came in with 2 guys. They dug the hole,formed the
top,lined the bottom with some pea rock and covered with landscape cloth for
drainage. They set a short base, passed inspection, and pumped the concrete. We
pitched the foundation about 1" from back to front so no water would lay
on It.Full clean up and then he got paid.
Now I paid more then Mickey to have this done, but It was well worth It. When
it was done I had a 6' foundation with about 12" of short base plumb and right
where I wanted it.Hard works done. Next just build the tower.
73 DE K4XZ Joe Patrick
More information about the TowerTalk
mailing list