[TowerTalk] Strength of chrome moly

Andrew J. Buckler (BBMSC) andrew.buckler at bbmsc.com
Mon Oct 29 12:29:24 EDT 2012


Hello,
I am interested in whether my specification for masting is appropriate. I have a EME H-Frame that I need to put up 20' from egress in a sleeved tubing system. Total inner tube length is 30', 18' of which is inside an additional outer tube. A 10m/6m duobander is at the point where the inner tube leaves the outer, 18' up from base or 8' from roof egress. Then, the H-frame 12' above that. I have been advised to use chrome moly for the inner, 2" OD. There are two wall thicknesses, .12 and .25. The .25 is twice the price, but within budget if advised. Of course, the real question is whether the design will sustain winds up to 90 mph at all. Diagram is attached in two forms, .png and .ppt.

Thank you,
Andy, K2OP
-------------------------------------
Andrew J. Buckler, Principal
BBMSC
225 Main Street, Suite 15 | Wenham, MA  01984  USA
Office: +1-978-468-0508
Fax: +1-978-468-0527
andrew.buckler at bbmsc.com<mailto:andrew.buckler at bbmsc.com> | www.bbmsc.com<http://www.bbmsc.com/>

This e-mail is from Buckler Biomedical Sciences LLC, a scientific research firm, and may contain information that is confidential or privileged. If you are not the intended recipient, do not read, copy or distribute the e-mail or any attachments. Instead, please notify the sender and delete the e-mail and any attachments. Thank you.



More information about the TowerTalk mailing list