[TowerTalk] Rohn 25 guying question
Gregg W6IZT
gregg.w6izt1 at gmail.com
Sat Mar 16 11:02:51 EDT 2013
Thanks to everyone for your replies. I have gotten some good feedback both
on and off list.
73
Gregg w6izt
-----Original Message-----
From: TowerTalk [mailto:towertalk-bounces at contesting.com] On Behalf Of Jim
Brown
Sent: Saturday, March 16, 2013 10:50
To: towertalk at contesting.com
Subject: Re: [TowerTalk] Rohn 25 guying question
On 3/15/2013 8:40 PM, Bryan Swadener wrote:
> Of course, the correct answer is to check with your PE (if a PE's drawings
are required by your permitting agency). If a PE's drawings aren't required,
check with the tower manufacturer (get it in writing). Ultimately, you want
minimal grief from any permitting problems, and you want your insurance
company to cover any potential loss.
Right. This is first an ENGINEERING question, and should be answered by
structural calculations by someone qualified to do so. Rohn's
recommendations are for a generic install with no limits on what can be
done, and for what they are sure will cover their behind legally. There
are always other safe ways to do things, but just staring at it and
saying "I did such and such and it didn't come down" is NOT a good
answer. At least not for MY tower, or for one that a friend would climb..
73, Jim K9YC
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk at contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
More information about the TowerTalk
mailing list