[TowerTalk] Tower buried section legs -- Buried in Concrete orBelow the Concrete?
john at kk9a.com
john at kk9a.com
Sat Jan 30 22:46:25 EST 2016
There are no weep holes in my Rohn 65G.
John KK9A
To: Dan Cisson <n4gnr at windstream.net>, 'Patrick Greenlee'
<patrick_g at windstream.net>, towertalk at contesting.com
Subject: Re: [TowerTalk] [Bulk] Re: Tower buried section legs --
Buried in Concrete orBelow the Concrete?
From: Grant Saviers <grants2 at pacbell.net>
Date: Fri, 29 Jan 2016 11:12:06 -0800
FYI, Rohn 65 with 4 bolt 5/8" thick flanges on each leg has one 1/4" weep
hole on each leg, at both ends right next to the flange. The flanges are
drilled to the leg od and welded outside and inside to the tube before
galvanizing. So there are redundant paths for water to escape. My PE
specified 1 foot of 3/4 gravel for the legs to be set into before the 4x4x2'
base pad was poured.
Grant KZ1W
More information about the TowerTalk
mailing list