Remember that most concrete is a conductor. Resistivity varies with the mix. 73, Jim K9YC On 3/5/2019 4:57 PM, Gary K9GS wrote: > Permanent installation on a dock piling.I would be securing something like a BigIR or DX Engineering vertical.The DX Engineering tilt base normally mounts to a 2.5-3" diameter pipe.