To: | rfi@contesting.com |
---|---|
Subject: | Re: [RFI] Solar Panel Manufacture Schedules Fix For Solar Panel RFI |
From: | Jim Brown <jim@audiosystemsgroup.com> |
Reply-to: | jim@audiosystemsgroup.com |
Date: | Wed, 16 May 2018 18:24:02 -0700 |
List-post: | <mailto:rfi@contesting.com> |
On 5/16/2018 3:55 PM, Mike NA6MB wrote: There is a good QST article here: I would change the word "good" to "flawed." The best things about it are that 1) it emphasizes the importance of twisted pair and shielding for all wiring carrying noisy current; 2) that the system as installed (and pair for) was VERY noisy by virtue of bad design of its components and by the installation; and 3) it takes a LOT of work (and money) to fix a bad system. 73, Jim K9YC _______________________________________________ RFI mailing list RFI@contesting.com http://lists.contesting.com/mailman/listinfo/rfi |
Previous by Date: | Re: [RFI] Solar Panel Manufacture Schedules Fix For Solar Panel RFI, Mike NA6MB |
---|---|
Next by Date: | Re: [RFI] Solar Panel Manufacture Schedules Fix For Solar Panel RFI, Randy Standke |
Previous by Thread: | Re: [RFI] Solar Panel Manufacture Schedules Fix For Solar Panel RFI, Mike NA6MB |
Next by Thread: | Re: [RFI] Solar Panel Manufacture Schedules Fix For Solar Panel RFI, KD7JYK DM09 |
Indexes: | [Date] [Thread] [Top] [All Lists] |