I was talking the other day with a local antenna guy about tramming. I
mentioned reading various cautionary tales on towertalk about masts getting
bent as a result of the tension on tramlines when relatively heavy antennas
are being moved up and down. He said he had never had this problem, but
opined that this was because he always left sufficient slack in the
tramline so that the tension didn't become too severe. I can visualize that in cases of extreme slack (i.e., where the tram line goes almost straight down from the tower to the load) the tension on the tram line would be almost zero, because virtually the entire antenna weight would be borne by the rope that controls the antenna sliding down the tram line. I have also experienced what happens when you try to pull a line bearing weight in the middle (like a center-fed sloper suspended from the top of a tower, at a 45-degree angle) really taut, in order to get the droop out. The tension required seems to increase almost exponentially as you get closer to dead straight, and you can't ever get all the slack out. The wire will break first. Is there a mathematical formula that will tell you roughly how much tension is required at a given load weight and degree of slack? Alternatively, is there a safe rule of thumb to tell you how much slack to leave in a tram line for a given load? 73, Pete N4ZR The World HF Contest Station Database is back, at www.pvrc.org _______________________________________________ See: http://www.mscomputer.com for "Self Supporting Towers", "Wireless Weather Stations", and lot's more. Call Toll Free, 1-800-333-9041 with any questions and ask for Sherman, W2FLA. _______________________________________________ TowerTalk mailing list TowerTalk@contesting.com http://lists.contesting.com/mailman/listinfo/towertalk |
<Prev in Thread] | Current Thread | [Next in Thread> |
---|---|---|
|
Previous by Date: | [TowerTalk] One Man Tower, cdwightbaker |
---|---|
Next by Date: | [TowerTalk] Heights Screw Drive and tower section needed, Craig Anderson |
Previous by Thread: | [TowerTalk] One Man Tower, cdwightbaker |
Next by Thread: | Re: [TowerTalk] Tension on tramline, W0UN -- John Brosnahan |
Indexes: | [Date] [Thread] [Top] [All Lists] |