I am looking for someone with experienced who have used a crane for tower
installation of 45g. I plan on hiring out the service but I am not sure if
the best thing to do is to have the tower in 1 or multiple sections for the
install. Also was considering have the rotor, mast and 2m/440 vertical
mounted before the lift. Can the 45g handle the weight without buckling
? Right now the plan is to put up the 10 sections all at once (guyed).
Please advise.
Also if you are a local HAM in the Kansas City area with REAL experience
would really appreciate help / mentor.
All the best,
Bill N1HWC