I'm about to raise a 72' US Tower equipped with a pair of TB2US thrust bearings 
spaced about 3'.? I'll be using a TailTwister2 Rotator.? Is there a procedure 
for centering these components to preclude binding?

I doubt there is a way to make the two bearings share the vertical load, so 
which one should I choose.? I'm thinking that the top bearing should take the 
load and use the lower bearing to stabilize the mast laterally.

-Mike-
WA6ZTY

##  DON’T  use the set screws in the 2nd ..lower  TB2US.   I use two of the 
same bearings on my UST-HDX-689.   Lower bearing is 4 foot down from the top.   
PP rotor is 6 foot down from the very top.   2 foot between
lower bearing and rotor.    The tb2us uses an eliptical locking ring.   It will 
either lock CW..or CCW.    Just make sure u know which way it went on.   A 
small recessed partial hole on the locking collare is whacked with a drift 
punch..to lock the ring.

##  so leave the bottom bearing loose....so it only takes the lateral 
load..that’s it.    You can only ever line up 2 things...not 3.   So with the 2 
bearings +  rotor.... it becomes the top bearing and rotor...never the middle
bearing.    And I sure as hell would not rely on that top double plate and 
cylinder  on the UST towers to take all the load...esp when rotor removed..mast 
elevated a bit...and only the top bearing used.  Not with
a 20 ft mast.... with  14 ft above the tower..and 6 foot into the tower.     
Which becomes   15 ft above and 5 ft below..when rotor is removed.   The double 
plate at  the top of the tower and cylinder has a set screw..used to lock the 
mast  when rotor is removed.   I would supplement that   with some temp u bolts 
on the mast +  angle steel..so the mast  doesn’t rotate in a high wind with 
rotor removed.

Jim  VE7RF
_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
<Prev in Thread] Current Thread [Next in Thread>