Towertalk
[Top] [All Lists]

Re: [TowerTalk] ground rod depth problem due to rocky soil -- solutions?

To: "'Towertalk'" <towertalk@contesting.com>
Subject: Re: [TowerTalk] ground rod depth problem due to rocky soil -- solutions?
From: "Doug Ronald" <doug@dougronald.com>
Date: Fri, 16 Nov 2012 10:48:34 -0800
List-post: <towertalk@contesting.com">mailto:towertalk@contesting.com>
Speaking of ground rods, the government has declared  some (54 actually)
excess at this link:
http://www.govliquidation.com/auction/view?auctionId=5760358&convertTo=USD

There are some structural aluminum tubes in the lot right next to the ground
rods too.

-Doug
AE6SY

-----Original Message-----
From: TowerTalk [mailto:towertalk-bounces@contesting.com] On Behalf Of Mat
Eshpeter
Sent: Friday, November 16, 2012 6:17 AM
To: Towertalk
Subject: Re: [TowerTalk] ground rod depth problem due to rocky soil --
solutions?

I have been reading the responses and have decided to try one last time to
get the rods as deep as possible. Last time around I rented a 20 lb Hilti
combination hammer drill/demo hammer. This time around I rented a 65lb
electric demo hammer -- a Hilti 3000. So I will attack the mountain tomorrow
and see what happens. I will be joining the rods together with 20 gauge 2"
copper strap so I think I will have quite a bit of contact with the soil --
just under 700 linear feet.
thanks for all your responses.

From: K7LXC@aol.com
Date: Tue, 13 Nov 2012 09:49:39 -0500
Subject: Re: [TowerTalk] ground rod depth problem due to rocky soil --
solutions?
To: towertalk@contesting.com; kk1c@live.com






>  I am finally getting around to putting up my 60' AN
Wireless tower on top of a rocky ridge in WV. I rented a Hilti demo hammer
and got about 1/3 of my rods in to the ground at least 4' -- but the
majority are only 2 or 3 feet deep because of the rocks/ledges. I don't
think I have much of a choice other than to cut the rods off and drive the
remnants into the ground field and exothermically weld my 20 gauge copper
strap to all of these shallow rods.
Other than paying big money for a well drilling rig to drill some deep 6"
holes and filling them with bentonite (which may not be possible given the
slope of the land and the fact that I now have 8 trenches running 75' out
from the tower pad) do I have any other practical alternatives?
 
    Sure. The rods can be installed horizontally.
 
Cheers,
Steve    K7LXC
TOWER TECH                                        
_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

<Prev in Thread] Current Thread [Next in Thread>