On Sat, 29 May 2004 14:06:07 -0000, David Robbins K1TTT wrote:

>Put a couple rods at the tower base and connect to the service entrance
>with heavy wire(2ga or 4ga I think is min size, I use 0000ga here). 

And remember that as far as lightning is concerned, INDUCTANCE can be a far 
greater factor than resistance in limiting the speed of discharge (and thus the 
voltage buildup). So follow basic circuit concepts -- multiple short paths in parallel, 
shortest possible paths, bond everything as well as you can, etc. I would sink big 
copper strap under the foundation taking a direct route from tower base to utility 
ground rods in addition to multiple rods around the area, and all bonded together 
outside the house. 