[TowerTalk] Plumbing a tower
Bill Turner
dezrat at copper.net
Tue Jan 22 10:15:49 EST 2008
ORIGINAL MESSAGE:
On Mon, 21 Jan 2008 23:16:53 -0700, David Gilbert
<xdavid at cis-broadband.com> wrote:
> but as I mentioned I
>was installing a free-standing tower where the base gets embedded in
>concrete long before the rest of the tower is added. The base sticks
>barely a few inches out of the ground, so I don't think a transit is the
>right tool for that job.
------------ REPLY FOLLOWS ------------
When I put up my 80-foot self supporting tower, I bolted the first
section to the stubs and built a framework to suspend that in mid-air
over the hole. I plumbed that before the concrete was poured and
double and triple checked it for plumb as the concrete was setting. A
week later I installed the rest of the tower and it was dead on.
73, Bill W6WRT
More information about the TowerTalk
mailing list