[TowerTalk] Cable management on a Crank up tower

Jon Casamajor k6el at comcast.net
Wed Jan 14 18:06:43 EST 2009


I have evolved to using a pair of carabineer's at each coax arm. One hooked
to the arm and the other to the one hooked to the arm. I am able to run 4
LMR400, a rotor cable and a SteppIR control cable through each one. I used
to capture the cables at each arm which allowed for four nice loops above
the ground but gave up on that as it never seemed to be the right length. It
just takes some care coming down to keep the cables sorted to not tangle
them.

Regards,
Jon-K6EL
k6el at comcast.net



More information about the TowerTalk mailing list