[TowerTalk] Another conduit question
Steve K7AWB
k7awbgoog at gmail.com
Mon Aug 28 14:45:42 EDT 2017
I recently asked about Pull ropes in buried conduit. Now I wonder about:
I can lay the abs conduit empty and either bury it early or keep uncovered in the trenches. Either way I would install Pull ropes and pull the cables through. But wait.
How about laying out the cables in a bundle and then slipping each ten foot abs piece over the end of the cables and slide it up to the previous abs piece and glue them together one at a time. In that manner I would not have to Pull heavy cable. I would have to watch the abs glue as it may melt the cable coverings.
Anyone done it these different ways and which method is not good to use?
Since the trench was made of fractured sharp basalt rocks, I had the rocks removed to a different area on the property. I will make a sand layer in the trench for the abs conduit to rest on and also cover them with sand and then complete the trench with Rock-less dirt.
Steve k7awb
More information about the TowerTalk