I think I have arranged most of the Rohn 45 that I need and have the concrete base and pier pin. I need to drill a hole for the pier pin and lost the name of the epoxy (Quikcrete brand?). I know it sets in about 2 days. Thanks to everyone for the help. 73 Dave K4JRB