It does not matter what opinion the very BEST on TT has, the one that counts
is that of the Permitting authority. Ask them. What they say is the Gospel.
And- check the Bond carried by your Contractor. He IS bonded, isn't he?
Bill-W4BSG
----- Original Message -----
From: "Dick Flanagan" <dick@k7vc.com>
To: <towertalk@contesting.com>
Sent: Monday, April 27, 2009 1:53 PM
Subject: [TowerTalk] Compacted vs. Undisturbed Soil
>A friend of mine is installing his first tower. It is a US Tower
> HDX454. (I thinks that's the right number. I have an HDX572 and his
> is the next one shorter than mine.)
>
> He had the tower specs checked by a local PE for the requisite wet
> stamp needed for his building permit. The PE calculated and
> specified a tower footing of 5'x5'x7.5' in undisturbed soil.
>
> His contractor dug him a 10'x10'x8' hole and is going to put a
> 5'x5'x8' plywood frame in the hole enclosing the rebar cage. He is
> then going to fill the frame with concrete and when it cures is going
> to remove the frame and back-fill the hole with compacted soil.
>
> My friend is being told that properly compacted back-fill is the
> equivalent of undisturbed soil. Is that true??
>
> Dick
> --
> Dick Flanagan K7VC
> dick@k7vc.com
>
>
> _______________________________________________
>
>
>
> _______________________________________________
> TowerTalk mailing list
> TowerTalk@contesting.com
> http://lists.contesting.com/mailman/listinfo/towertalk
>
>
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
|