| They want to see ground rods.  They look at houses every day and the 
inspector told me he had never looked at a tower before - ever.  Plus the 
tower base is poured 6 weeks ago.  So I need to put in a couple of ground 
rods and just need to know what the typical house install rod height is. 
73/jeff/ac0c
www.ac0c.com
alpha-charlie-zero-charlie
-----Original Message----- 
From: jimlux 
Sent: Monday, October 23, 2017 10:15 PM
To: towertalk@contesting.com
Subject: Re: [TowerTalk] height of ground rod at tower base
On 10/23/17 7:00 PM, Jeff wrote:
 What does the NEC code (meaning a safety ground and not the more expansive 
proper lightning dissipation) for minimal grounding of a tower?
I need to get the rural county building inspectors out to look at my 
towers and want to show them something that they will have seen before 
with respect to a basic safety ground.  From what I understand locally 
that means a pair of ground rods in a configuration like what would be 
required at a house for the mains entry. 
 
Today, that means a Ufer ground - 20 ft of conductor embedded in the
concrete. Conductor can be rebar.
 To that end I am unsure what the height of the ground rod should be in the 
NEC context?  Is the connection wire/rod joint to be made above grade, 
even with grade or below grade?
73/jeff/ac0c
www.ac0c.com
alpha-charlie-zero-charlie
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
 
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk 
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
 |