| To: | <amps@contesting.com> |
|---|---|
| Subject: | Re: [Amps] Vacuum Relay |
| From: | "Paul Christensen" <w9ac@arrl.net> |
| Date: | Fri, 14 Dec 2012 15:06:14 -0500 |
| List-post: | <amps@contesting.com">mailto:amps@contesting.com> |
The dual trace function isn't required to determine if hot-switching occurs, but is required to measure system timing. Sheesh, did I write that? My mind was stuck looking at the current trigger configuration coming from the CW keyer on Channel B. Of course a single channel scope can be used to measure simple timing when using an external trigger input. Paul, W9AC _______________________________________________ Amps mailing list Amps@contesting.com http://lists.contesting.com/mailman/listinfo/amps |
| <Prev in Thread] | Current Thread | [Next in Thread> |
|---|---|---|
| ||
| Previous by Date: | Re: [Amps] GS-35B Efficiency Varies with frequency?, Paul Baldock |
|---|---|
| Next by Date: | Re: [Amps] Vacuum Relay, Carl |
| Previous by Thread: | Re: [Amps] Vacuum Relay, Paul Christensen |
| Next by Thread: | Re: [Amps] Vacuum Relay, Carl |
| Indexes: | [Date] [Thread] [Top] [All Lists] |