| To: | rfi@contesting.com |
|---|---|
| Subject: | Re: [RFI] Solar Panel Manufacture Schedules Fix For Solar Panel RFI |
| From: | Jim Brown <jim@audiosystemsgroup.com> |
| Reply-to: | jim@audiosystemsgroup.com |
| Date: | Thu, 17 May 2018 09:55:26 -0700 |
| List-post: | <mailto:rfi@contesting.com> |
On 5/17/2018 9:20 AM, Alan NV8A wrote: Correct me if I am misremembering, but isn't running Romex in conduit a Code violation? I don't know. I've never thought about doing that. It would be much harder to pull than individual conductors and it would be a waste of conduit fill capacity. Running twisted separate conductors in conduit would not be. Right. And if it's steel conduit, twisting is not important. 73, Jim K9YC _______________________________________________ RFI mailing list RFI@contesting.com http://lists.contesting.com/mailman/listinfo/rfi |
| Previous by Date: | Re: [RFI] Solar Panel Manufacture Schedules Fix For Solar Panel RFI, Alan NV8A |
|---|---|
| Next by Date: | Re: [RFI] Solar Panel Manufacture Schedules Fix For Solar Panel RFI, nm8rmedic via RFI |
| Previous by Thread: | Re: [RFI] Solar Panel Manufacture Schedules Fix For Solar Panel RFI, Alan NV8A |
| Next by Thread: | Re: [RFI] Solar Panel Manufacture Schedules Fix For Solar Panel RFI, nm8rmedic via RFI |
| Indexes: | [Date] [Thread] [Top] [All Lists] |